Roundhouse/Engine Facility Re-work
Click any image for larger, higher quality one.
|
04/1/2009
The new turntable has already been set. The roundhouse building on the site in the picture is the new one that will be added onto.
|
04/1/2009
Scott (left) and Rory (right) pose with their work on the roundhouse after paint has been applied for under the (eventual) groundcover.
|
04/1/2009
|
|
04/1/2009
The diesel shop, which is in the foreground has its building removed. The old diesel hose building will be reused.
|
06/30/2009
Adding the inbound roundhouse tracks...
|
06/30/2009
Adding the inbound roundhouse tracks...
|
|
06/30/2009
More tracklaying. We used Atlas code 83 held down by clear silicone household adhesive.
|
07/16/2009
The new Walthers roundhouse is now assembled and in place. We fastened to the benchwork to avoid problems with indexing on the turntable.
|
07/16/2009
|
|
08/9/2009
The coaling tower, ash pit and watertower are now in place at the new roundhouse.
|